Zamori Engineering Services delivered a substantial solar photovoltaic installation at the Tshwane Automotive Special Economic Zone, supporting renewable energy use within a demanding industrial environment.

Installed capacity 490 kW
Client Tshwane Automotive Special Economic Zone
Location Pretoria, Gauteng
Sector Automotive and industrial
Solution Commercial solar photovoltaic installation
Project overview

Renewable energy for a major industrial development

Zamori Engineering Services completed a 490 kW solar photovoltaic installation at the Tshwane Automotive Special Economic Zone, commonly known as TASEZ, in Pretoria.

The project introduced substantial on-site renewable energy capacity within an automotive manufacturing environment. It supports the zone's wider focus on energy resilience, operational sustainability and greener industrial infrastructure.

TASEZ forms part of Tshwane's automotive manufacturing region and supports investment, localisation and component manufacturing. Reliable electrical infrastructure is therefore essential to the day-to-day operation of the businesses situated within the development.

The project context

Supporting a high-demand industrial environment

Automotive and industrial facilities depend on reliable power to operate specialised equipment, maintain production schedules and manage operating costs.

Rising electricity costs and interruptions to grid supply have also made energy resilience a serious consideration for commercial and industrial properties across South Africa.

The TASEZ project required a large-scale solar solution capable of producing meaningful renewable energy within an active industrial setting, while integrating safely with the site's electrical infrastructure.

Commercial solar panels installed at TASEZ in Pretoria
The Zamori solution

A 490 kW commercial solar PV installation

Zamori Engineering Services installed a 490 kW solar PV system designed to increase on-site electricity generation and reduce dependence on grid-supplied power during solar production hours.

The installation demonstrates Zamori's ability to deliver renewable energy infrastructure for substantial commercial and industrial applications, where careful planning, electrical integration, safety and long-term performance are critical.

01

Lower grid dependence

The installation provides renewable electricity during daylight hours, reducing the amount of power required from the grid.

02

Energy cost management

On-site solar generation can help an industrial facility gain greater control over long-term electricity costs.

03

Renewable energy use

The project increases the contribution of renewable energy within a major South African industrial development.

04

Industrial resilience

The system forms part of a broader approach to improving energy resilience in an electricity-intensive operating environment.

05

Lower operational impact

Solar generation reduces reliance on electricity produced from conventional grid sources during production hours.

06

Scalable engineering

The project demonstrates the practical application of large-scale solar engineering within an active industrial environment.

Project implementation

Engineering a solution around the operating environment

A commercial solar installation of this scale requires coordination between the engineering team, site management and other project stakeholders.

The implementation process for an industrial solar project typically considers the available installation area, electricity requirements, existing infrastructure, equipment layout, electrical integration, testing and final commissioning.

Every stage needs to be approached with careful attention to safety, technical compliance, operational continuity and long-term system performance.

Key project considerations

  • Available rooftop or installation area
  • Facility electricity demand and operating hours
  • Existing electrical infrastructure
  • Solar system sizing and technical design
  • Safe integration with the site's electrical systems
  • Equipment installation and commissioning
  • System monitoring and long-term performance
The outcome

Almost half a megawatt of installed solar capacity

The completed installation added 490 kW of solar generation capacity to the TASEZ environment.

During daylight production hours, the system can supply renewable electricity directly to the connected operations, reducing the amount of electricity that needs to be drawn from the grid.

The system's contribution at any given time will depend on solar conditions, facility demand and its final operating configuration.

Beyond its immediate energy contribution, the project shows how renewable power can be integrated into industrial infrastructure while keeping operational reliability at the centre of the solution.

Why this project matters

Practical renewable energy for South African industry

The TASEZ installation is an important example of renewable energy being applied within a major South African industrial development.

For Zamori Engineering Services, the project provides clear evidence of the company's ability to undertake substantial commercial and industrial solar installations in demanding operational environments.

It also demonstrates the importance of combining solar generation with sound electrical engineering , ongoing monitoring and appropriate maintenance support .

Commercial solar expertise

Energy solutions designed around real operating requirements

Zamori Engineering Services provides solar and engineering solutions for factories, warehouses, hospitality properties, agricultural operations, offices and other commercial facilities.

Each project begins with an assessment of the property's electricity consumption, operational requirements, available installation space and existing electrical infrastructure.

The objective is not simply to install solar panels. It is to create an energy solution that works within the client's operating environment and continues to perform over the long term.

Solutions may include

  • Grid-tied solar PV systems
  • Hybrid solar and battery systems
  • Commercial battery storage
  • Backup power integration
  • Electrical infrastructure upgrades
  • Solar performance monitoring
  • Preventative system maintenance
  • Energy audits and consumption analysis
Frequently asked questions

TASEZ solar project

How large is the TASEZ solar installation?

The solar photovoltaic installation completed by Zamori Engineering Services has a total installed capacity of 490 kW.

Where is the project located?

The project is located at the Tshwane Automotive Special Economic Zone in Pretoria, Gauteng.

What type of environment does the system serve?

The installation serves an automotive and industrial environment where electricity demand, operational reliability and long-term energy costs are important considerations.

Does Zamori install commercial solar systems elsewhere in Gauteng?

Yes. Zamori Engineering Services provides commercial and industrial solar solutions in Pretoria, Johannesburg and other areas, depending on the scope and location of the project.

Can Zamori assess an existing commercial property?

Yes. A commercial solar assessment can consider electricity consumption, existing infrastructure, available installation space, operating hours and the client's energy objectives before a suitable solution is proposed.

Plan your project

Discuss your commercial solar requirements

Speak to Zamori Engineering Services about a commercial or industrial solar installation designed around your facility, electricity usage and operational needs.

Request a Solar Assessment